SciELO - Scientific Electronic Library Online

 
vol.14 número3Sobre el aprovechamiento de los residuales de la empresa Gydema para la producción de aceite de maíz refinadoConsideraciones metalmecánicas para la prevención de fallas en una inversión de la industria de procesos químico índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

  • No hay articulos citadosCitado por SciELO

Links relacionados

  • No hay articulos similaresSimilares en SciELO

Compartir


Revista Universidad y Sociedad

versión On-line ISSN 2218-3620

Resumen

ITURRALDE CARRERA, Luis Angel; JIMENEZ BORGES, Reinier; MOLINA SANTANA, Ernesto  y  ALVAREZ GONZALEZ, Andrés Lorenzo. Photovoltaic generation potentials on the roof of the CRAI building of the university of Cienfuegos. Universidad y Sociedad [online]. 2022, vol.14, n.3, pp. 318-330.  Epub 30-Jun-2022. ISSN 2218-3620.

The following research presents the calculation of the photovoltaic generation potentials from the use of the roof surface of the CRAI building of the University of Cienfuegos. For this, a constructive survey of the building was started where the incidence of shadows, the orientation and inclination of its roofs were analyzed, as well as the specific meteorological information of the territory, necessary for the generation calculations and its inclusion in the PVsyst software. 7.1. Finally, the calculation of the sub-arrangements of the Solar Photovoltaic System (SSFV) for the building was carried out from the use of nationally produced photovoltaic modules and inverters available as references in the specialized software. The simulation with the PVsyst 7.1 showed that in the building there is an available area of ​​building roofs of 603 m2, an area where it is possible to install a total of 311 photovoltaic modules of the DSM-380 model, with a generation capacity of 118 kWp and a real annual generation of 148.7 MWh / year. The economic evaluation gave the best option considering the investment costs that of China, being 1 846 444.32 CUP and a recovery period of 9 years.

Palabras clave : Consumption; building roofs; electricity; Pvsyst; Photovoltaic Solar System (SSFV).

        · resumen en Español     · texto en Español     · Español ( pdf )