Mi SciELO
Servicios Personalizados
Articulo
Indicadores
- Citado por SciELO
Links relacionados
- Similares en SciELO
Compartir
Ingeniería Hidráulica y Ambiental
versión impresa ISSN 1680-0338
Resumen
GUTIERREZ URDANETA, Luis; PENA PUPO, Leonardo y HIDALGO GONZALEZ, Ramón. Determination of the design head in hydropower storage projects. riha [online]. 2019, vol.40, n.3, pp. 126-140. Epub 30-Sep-2019. ISSN 1680-0338.
The preliminary design head for run-of reservoir hydropower projects in Cuba is determined as the time-weighted average of net head obtained through reservoir simulation. This paper proposes three alternative methods for obtaining the optimal preliminary design head as follows: 1- by the frequency histogram of the net head, 2- by the net head duration curve and 3- by the generalized reduced gradient method (non-linear programming). Any of these three methods offers a better approximation to this parameter.
Palabras clave : design head; net load duration curve; hydropower project optimization; low load sites.