Mi SciELO
Servicios Personalizados
Articulo
Indicadores
- Citado por SciELO
Links relacionados
- Similares en SciELO
Compartir
Centro Azúcar
versión On-line ISSN 2223-4861
Resumen
BRAVO DE LAS CASAS, Marta; QUINTANA DE BASTERRA, Grettel y SANCHEZ VAZQUEZ, Lendy. CHANGES IN THE VILLA CLARA PROVINCE NETWORK DUE TO THE CONNECTION OF FUTURE BIOELECTRIC PLANTS. cen. az. [online]. 2019, vol.46, n.3, pp. 45-53. Epub 01-Sep-2019. ISSN 2223-4861.
Progress in technologies for the exploitation of renewable energy sources makes increasingly the use of them feasible and useful. Cuba does not remain behind in relation to this aspect. In the country is being carried out several projects for construction and implementation of biomass plants in order to generate electricity. There are areas of the island where the work realization has begun. In Villa Clara province, the start-up of three bioelectric plants, Héctor Rodríguez, Washington and Quintín Banderas, is planned for years 2019, 2023 and 2028 respectively. This work objective is to determine the electric network problems in Villa Clara province by connecting the bioelectric plants to the National Electric System, both in construction and electrical aspects. The network operation conditions for bars voltages, power lines transfers, and levels of short circuit in different bars were obtained with PSX software help. A preliminary calculus has done for the necessary cost inversions in the electric network.
Palabras clave : electricity production; renewable energies; power electrical systems.